Actual Achievement
Keihin Yodo Logistics Yard
- Client
- Keihan Electric Railway Co.,Ltd.
- Planning site
- 555-1 Yodomizuchō, Fushimi-ku, Kyōto-shi, Kyōto-fu
- Site area
- 52,879.37㎡
- Construction area
- 26,996.98㎡
- Total floor area
- 42,954.75㎡
- Use
- Warehouse
- Structure and Scale
- 2 story steel structure
- Construction period
- Feb. 2015- Feb. 2016
F&P`s Role
F&P Supervised the design and construction of the project.
This was a challenging project because of the narrow lopsided land scape, with residents and farm fields on the South side making noise control a priority. By working with the architectures, we were able to fulfill the clients needs without compromising the quality and time schedule.