The construction completion ceremony of the [Shion Nakano Funeral Hall] by Bright Shinshu Co., Ltd. was held.

2017/06/01

The construction completion ceremony for Bright Shinshu Co., Ltd. “Family Funeral Hall SHION NAKANO” ,which F&P designed and supervised was held on 6th May, 2017.

This facility is the fourth family funeral hall we have been worked on for SHION, which features a Mid-scale funeral hall and banquet room (approx. 50 people capacity) and a family funeral hall (approx. 150 ㎡).

We had provided total management by creating the Master plan, designing of the basic plan, selecting the contractor, supervising & Implementation design, and supervising the construction. We coordinated with the designer/contractor to incorporate Shion`s balance of practicality and design, to create the best facility for the customer.

In designing the basic plan, we used BIM*1 as well as 2D CAD which was recommended by Yamaura corporation (Designer/Constructor). By creating the facility completion image in 3D it made it possible to get a clearer consensus in the designing with the customer. We were also able to accelerate the project by utilizing the 3D BIM basic plan into the final implementation design phase.

We believe that this facility will become well rooted into the local community.

 *¹ BIM is an abbreviated name for Building Information Modeling. It is a solution for making information utilization with 3D architectural digital model drawing on computer, in every process from architectural design construction to maintenance.


建築概要

Client   Bright Shishu Co., Ltd.
Address Nakano, Nagano 
Site area 2,675.77㎡
Building area  759.24㎡       
Total floor area  655.79㎡   
Use Funeral hall
Structure and Scale 1F, Steel Structure
Construction period September, 2016 – May, 2017   