The construction of NIHONSHURUIHANBAI’s “Northern Kinki LC New Construction” has completed.

2020/10/14

 The NIHONSHURUIHANBAI’s “Northern Kinki LC New Construction”, which F&P conducted design and supervision, was held on October 14.

  

 The facility is a dedicated (BTS) distribution facility for NIHONSHURUIHANBAI CO., LTD. that mainly handles beverage products, distributing to the Northern Kinki area, including Kyoto.

 F&P gave a presentation and proposed for design supervisor selection due to the excellent reputation from the Atsugi Center design supervision project conducted on 2011 and received an order.

 F&P have aimed to develop basic design, implementation design, and construction supervision, and to create facility with high quality, reflecting the request of NIHONSHURUIHANBAI CO., LTD as a dedicated center. Point-colored oranges were used at the exterior design and were also used in the internal amenities.

 In recent years, the site has become a popular area for logistics, with 15 minutes on Yawata Keitanabe IC, providing convenient transportation to the Kyoto area, Shinmeishin, Keiji Bypass, and Osaka.

 In the future, F&P hope that the facility will contribute to the development of NIHONSHURUIHANBAI’s retail products as Northern Kinki Logistics Center.


Construction Summary

Client NIHONSHURUIHANBAI CO., LTD.
Planned Site 13-11 Oaza Taga Koaza Horibata, Ide-cho, Tsuzuki-gun, Kyoto
Site Area 10,296.94㎡
Building Area 6338.00㎡    
Total Floor Area 14,227.00㎡
Usage Warehouse engaged in warehousing business
Structure and Scale S structure, partially RC, 4F
Construction Period November 1,2019 ~ September 30,2020