The groundbreaking ceremony of Aeon Hokkaido Co., Ltd.’s “AEON Ishikari Center (tentative name)” was held.
The groundbreaking ceremony for the Aeon Hokkaido Co., Ltd.’s “AEON Ishikari Center (tentative name)”, which F&P provides project management, was held on March 26.
This is a facility that has been installed in the Process Center, which is responsible for the manufacture of the products, combined with a distribution hub for low-temperature distribution in Hokkaido, including the delivery of the manufactured products.
As part of the project management, F&P conducted basic planning and design supervision, executing the project.
F&P were able to compile complex line plans, equipment plans, and operation plans as facilities that can function as distribution centers that can integrate goods procurement, manufacturing, and distribution operations with a view of future expansion. In addition, the plant is equipped with a normal power generation system using two 700 KW gas engines and a facility compatible with BCP, such as the diversification of water supply sources.
Aiming to complete construction by the end of May 2021, F&P will contribute to the completion of high-quality facility as a major facility that combines Aeon Hokkaido’s food production center with a low-temperature distribution center.
Construction Summary
Client | Aeon Hokkaido Co., Ltd. |
---|---|
Planned Site | 2-chome, Shinko Minami, Ishikari City, Hokkaido |
Site Area | 121,636.33㎡ |
Building Area | 17,886.45㎡ | Total Floor Area | 27,559.80㎡ |
Usage | Warehouses not engaged in factory or warehousing business |
Structure & Scale | 2F, Steel structure | Construction Period | March 26, 2020 ~ May 31, 2021 |